Saturday, 10 July 2010
Haromthwaite 2: Baseboard Assembly
Tuesday, 31 March 2009
Haromthwaite 1: Getting On The Case (or In It)
Since taking over as the Association's Publicity Officer in October 2007 I have gradually been refining the 2mm Publicity Stand with new display materials and features. I've had a lot of help from other members on the way of course and the '2mil Roadshow' is starting to get noticed and invited to more shows. I think Society stands are so much better if they have some sort of movement on them, whether it be a live modelling demo or trains running and being shunted etc. With this in mind I have determined to build a compact demonstration layout as an adjunct to the Publicity Stand. I have also decided to enter it into the GJLC to give me the incentive to hack it within 12 months or so.
What am I aiming to achieve with this new micro-layout?
a) It should be a long and thin layout that can sit on the front edge of a standard 6 foot trestle table and still allow plenty of room for the stand staff to model, hold court etc.
b) For ease of transport to and from exhibitions itt should pack away as small as possible in one hand-held carry case.
c) The track plan should be simple and yet prototypical.
d) It should showcase the latest Association products and techniques.
e) Simple shunting operations should be possible using electro-magnets and various delayed coupling systems. Reliable delayed action auto coupling systems always impress the punters!
f) Designed for both DCC and DC operation, according to the preferences and stock available of those manning the stand.
g) It should be modelled to a high standard in all respects but at the sime time appear as something achievable by a potential member viewing it.
At about this time I was having a clear-out at work and came across an old lock sample case that was fitted out with a custom cut foam interior. The foam was soon discarded leaving a sturdy case ideal for housing a small layout:

The interior dimensions are approx 20" x 15" x 4". I have been much impressed by Anthony Yeates' micro layout that folds in the middle and lives a box-file. It didn't take me long to work out that if I made a layout that folds in two places I could have three boards each 20"x5", giving a total size of 60" x 5", ideal for the front of a trestle table and have it fit snugly in a fairly decent case that had cost nowt (as we say in Yorkshire).
The three baseboards are to be made from 10mm birch ply and were very kindly donated to the project as a kit of ready-cut parts by friend and member Alan Smith. Through his business Alan has access to some high-tech CNC woodworking machinery and can knock out baseboard components very quickly - see the curved boards for Tony's 'Braffertion' project which are from the same source. I collected them from Alan at Ally Pally last weekend where he was demo-ing Easitrac turnouts to great acclaim.

The shot above shows the three track deck boards laid into the case and the shot below shows how the boards will fold sideways.

The shot below shows the kit of plywood parts for one board, which will be glued and screwed together. However before doing this the end pieces and intermediate cross members need hole-sawing to provide wiring ports. The intermediate cross members will only be added once turnout postions have been finalised. With each board only being 500 x 120mm I'm looking forward to being able to work on them at my normal workstation - they are really tiny compared to the one-piece 1500 x 500mm of Niddbeck Bridge and the 1200 x 600mm boards of Pool-In-Wharfedale.

In the next instalment I'll reveal the general layout design, it's track plan and the prototypes that inspired it .
Friday, 16 January 2009
Dark & Grey...

Sunday, 27 July 2008
Brafferton Update - 3. Site Visit
I know; I lied. As I haven't got the tracklaying photos sorted yet, I thought I'd tell you about my site visit. This sort of thing is a must if you're modelling a real place. I used to live just 10 minutes away from Brafferton, but it's a bit more remote now. So I made plans to call in whilst in the area.
I've always known that the most of the station was demolished post closure, but nothing can prepare you for what is total obliteration of the railway artifacts. The saving grace is that the road bridge and associated cutting survive. Other than that, I'll have to rely on the handful of old photos and the snippet of cine-film that I have.

Looking down the cutting. Other than the bridge, it is the only evidence of a railway ever having been here.
The bridge is in fairly good condition and I have comprehensive photos to aid my model building.
Looking back down the cutting from the road. No, that's not a goods shed!
Brafferton Update - 2. Design Pt ii
With the change in the geometry of the baseboards, I decided to change the layout design. There would still be three fully scenic boards, but the staging would be on two only and therefore the layout would be more than 50% scenic. I could not now show all of the scenic boards and meet the Layout Challenge criteria. Nevertheless, I will proceed. If I need to designate a smaller area for Challenge purposes, I will cross that bridge when I come to it. Here is my first stab at the redesign:
However the longer track length on the new design got me thinking; could I revisit the actual station plan (ie OS map) and get the layout plan almost to scale length? Here is the 1909 OS extract with various jottings and computations:
Better than I thought! The length from the bridge to the end of the coal drops can be modelled without compression and gives, what I think is, a rather elegant plan:
Now to progress the baseboards. Trackbuilding has already commenced, courtesy of Easitrac, but more of that next time...
Brafferton Update - 1. Design Pt i
Firstly planning. The idea for Brafferton originally germinated several years ago and I've kicked ideas around for quite a while. Whilst the actual station was dead straight, I've always thought it would be fun to build a circular layout. Here is an early attempt to present Brafferton in that format (undated, but probably c.2000):

Much of my information came from the Allanwood Press publication "The Pilmoor, Boroughbridge and Knaresborough Railway" by Patrick Howat. Here is the 1902 Signal Plan fron that book:
If it wasn't for the Layout Challenge, I suspect that nothing further would have happened. With the advent of the Challenge, I set to revising my plans to a. fit in with the Challenge rules and b. to meet my own operational requirements as a portable, exhibitable layout:
I commissioned Alan Smith to laser cut some baseboard pieces for me. At this point he suggested a five piece circle, rather than the six I had envisaged, to add structural stability to the erected layout. Fair comment, but now I would have to rethink my design, and it would take the layout outside the Challenge rules in terms of the total area of layout. I gave the go-ahead to the boards and returned to the drawing-board...