Showing posts with label GJLC. Show all posts
Showing posts with label GJLC. Show all posts

Monday, 12 July 2010

Better Late Than Never

Wow! That was good wasn't it? Expo, I mean. 50 years? It seemed like there were nearly fifty layouts.

Well done to everyone who contributed in whatever way.

Now I know, I haven't blogged for what appears like fifty years. But so much gets in the way of modelling sometimes. Suitably encouraged by Expo, where Brafferton performed reasonably well for much of the time, I press on.

For Oxford, I painted two part backscenes to relieve the mass of hardboard that would have otherwise formed the backdrop. On my return, I've started using these to sketch out what the backscene really ought to look like:


Also, the 04 finally got chipped and seems to be running well in it's new DCC state.

The legs on Brafferton were commented on quite a lot over that Expo weekend. These were substantially the idea of Edward who also helped with their construction. Indeed Edward and Alan Smith have contributed greatly to the legs and baseboard side of things on Brafferton; thanks for your support guys:


How long to the next blog? Soon, soon...

Saturday, 2 January 2010

20th Century Boy :: 21st Century Schizoid Man

The dawn of a new decade! (Unless you're a pedant and propose waiting another 12 months.) New resolutions, new dreams, new aims!

Hang on a minute. I didn't complete a single layout in the last decade. And my previous effort was completed in the last Century. So much for focus and drive...

I really must make an effort to get Brafferton finished by 2020. (Diamond Jubilee Layout Challenge, anyone?) To have it something like presentable by July would be a great bonus and progress is currently steady but sure. To alleviate the boredom of wiring, I'm also pushing on with the scenics. The station buildings need resolving; there is not a scrap of the original buildings remaining and I have three photographs all showing much the same detail all at oblique angles.

Using some fairly rudimentary drafting skills, counting brick courses and extrapolating measurements from the photos, and also using various written commentaries, I cobbled together some elevations for the main buildings. These were then copied, pasted to card and rough mock-ups made. Satisfied with the proportions of these, I roughed-up some platforms with a view to getting the best placement for the buildings:


As you may be aware, the full size station was dead straight, but the model is on a constant curve. I'm not sure that making the buildings as a curve would particularly work (!), so some compromise is necessary. Original plasterwork has had to be carved back to give sufficient space for the buildings. You can also see here that I've reworked the rear of the scenery to accommodate the siding more subtly:


Down on the floor, some impression can be gained of the effect aimed for. The road bridge seems suitably distant:


This is one of the few photos I possess of the real thing; in this instance, kindly sourced by Andy Hanson. If anybody has a couple of dozen unpublished shots of the the station, I can arrange a trade-in for beer tokens:


Friday, 18 December 2009

Welcome Back My Friends To The Show That Never Ends

Having fallen off the railway modelling map for some six months, I am now managing to get some modelling done. Our business purchased a second outlet in July and needless to say, this has taken up much of my time!

Anyway, back to more interesting stuff. The priority is to get the layout fully functioning by EXPO 2010 (you haven't forgotten about that, have you?). The second and third boards needed wiring and a bit of trackwork completing. To ease myself gently back in, I started with the third board which only has two points forming a crossover. After a few teething problems (mainly me not reading the Tortoise instructions; the switching contacts aren't Left/Common/Right as I'd assumed, but Left/Right/Common), everything seems to work well on here. The temporary loose wires will be replaced by plugs and sockets at each board joint.


On to the second (middle) board now. This need a few bits of plain trackwork inserting before starting the wiring. Here are the three scenic boards assembled. Looks like I need a bigger house...


Saturday, 30 May 2009

Easitrac Turnout

A few days ago I promised a posting on the progress I've been making with assembling an Easitrac turnout. Tonight I made quite a bit of progress on it, so it seems a good time to show you what I've been up to.


The photo above shows progress after the first evening. The straight stock rail is in place, and the crossing assembly has been soldered-up (using the assembly jig on the right). This is a left hand B7 turnout, and is build using a C&L template. The turnout timber positions don't match the milled base exactly, but are close enough for my purposes.

Another couple of hours work tonight brings the story up to date. I've yet to make the turnout blades, and will probably build a jig to make filing these easier, particularly as I need several more turnouts of this type. There are also more chairs to add to the left-hand end of the stock rails. The crossing nose needs a slight adjustment with a file as my first trials with a wagon showed that one of the flangeways is a bit on the tight side.
I'm sure subsequent turnouts will be quicker and easier to make - this is my first 2mm turnout and it's been a bit of a learning curve at times.
Andy

Thursday, 28 May 2009

On the Fiddle (Yard)


No - nothing to do with MPs and their expenses!

The photo shows progress on one of the fiddle yards for my GJLC entry. This is my second attempt at this - the first (using foamcore board) wasn't good enough, so having seen David Mallot's design for Kylestrome, I redesigned and rebuilt the boards using plywood (thanks for the inspiration, David).
As you can see from the photo, most of the track is now laid. The next job is to make some sliding brass catches to accurately locate each track (and transfer the power to each track). I'll be using my Proxxon milling machine to make these.
You can also see part of one of the main boards for the layout - these need some more work, notably adding the trackbed (supported on short riser blocks) and some bracing.

I've also started on the Easitrac turnouts required for the scenic part of the layout - these will be featured shortly in a separate update.
Andy

Wednesday, 7 January 2009

Post-Christmas Blues

Apart from a bit of wagon building over the Christmas holidays, there is very little progress to report on my GJLC entry. The baseboards are part complete, and await a couple of free evenings (and some renewed enthusiasm on my part) for me to try and finish them off. In the meantime, I've been doing some tests on laying and ballasting of track.


The photo about shows my NER brake van sitting on a short piece of painted Easitrac which I ballasted using 'chinchilla dust' (obtainable from pet shops). The track was stuck down onto an offcut of thin plywood with double sided tape, and ballast placed dry around the sleepers and tamped down onto the adhesive tape. The ballast was then misted with car screenwash to hold it in place and Super-phatic resin adhesive dribbled over the ballast. When it was all dry, the ballast was still loose in places, so I gave it a spray of Humbrol matt varnish.


I wasn't entirely happy with this approach - it was a bit messy, and the ballast isn't very secure even now. I'm going to try a few different adhesives and ballast and hopefully find something that works a bit better.
One other project I'm hoping to start soon is an Ivatt 2-6-2t using a Dapol body and the chassis etch developed by Nigel Hunt (and advertised in the latest 2mm Magazine). I've now got all the bits I need to start construction, so watch this space for some progress reports!

Andy